Project #2 - Cooling Tower Replacement

Project #2 - Cooling Tower Replacement


Scope of Work:


Client advised TurboChyll that the Fan Motor Shaft had final broke and it was time to replace the Cooling Tower entirely.

TurboChyll hired an Engineer and Structural Engineer to develop Drawings and Plans to provide the client a price on.

Once awarded the project, TurboChyll worked to Remove the Existing Cooling Tower and properly Dispose of.

Install New Steel according to Structural Engineers Drawings.

Furnish and Install / New Cooling Tower onto New Steel with New VFD’s, New Spring Isolators, New Electrical Panels, and New Chilled Water Piping/Insulation.

After Photos of New Tower Install – Including New Steel / Piping / VFD’s

By Tom Donohue May 5, 2025
Building is renovating space to become a New Resident’s lounge area with an outdoor terrace area.
By Tom Donohue May 5, 2025
Disassemble and remove existing 10 Ton Main for Rack Room Chilled Water Air handling unit and properly dispose of.
By Tom Donohue May 5, 2025
This project involved assessing, refurbishing, and upgrading components of existing air handling units to extend their operational lifespan, improve energy efficiency and maintain indoor air quality without a full replacement.
By Tom Donohue May 5, 2025
The client informed TurboChyll of the necessity for additional cooling in their upscale night club, which features an expansive hot tub. In response, TurboChyll implemented a VRF system to regulate humidity levels.
By Tom Donohue May 4, 2025
Improved operating efficiency by operating at the fan's best efficiency point and using speed control.
ECM Wind Walls
May 1, 2025
ECM Wind Wall Retrofits on 108 Data Aire Units
More Posts