Project #5 - 10 Ton Unit–Supplemental Cooling

Project #5 - 10 Ton Unit–Supplemental Cooling


Scope of Work:


  • Disassemble and remove existing 10 Ton Main for Rack Room Chilled Water Air handling unit and properly dispose of.
  • Furnish and Install (1) Custom Indoor MLRa Supplemental 10 Ton AHU to include the following:
    - 2” Double Wall Construction
    - Custom stand/base to allow bottom intake
    - Filters (2” MERV8)
    - “A” style chilled water coil
    - Fan & a humidifier shipped loose to be installed in duct
    - The approx. dimensions are: 64” High (12” stand) x 62” Wide x 36” Deep
    Includes Packaged Controls:
    - Touchscreen Sensor
    - Chilled Water Valve (24V)
    - Programming
  • Reconnect existing piping as required. Re-Insulate existing piping if required.
  • Furnish and Install Ductwork to connect to existing.

Completed Project Photos

Design:


Details of Project #4
ECM Fan Array
By Tom Donohue April 8, 2026
Our team recently completed the installation of high-efficiency ECM fan arrays for a major global telecommunications company, upgrading their air handling system to improve reliability, efficiency, and airflow control.
By Tom Donohue March 27, 2026
TurboChyll delivered a turnkey modular chiller replacement, upgrading four legacy Multistack units to four new 30-ton Aermec modular chillers.
By Tom Donohue March 26, 2026
The 20th floor return air system relied on an outdated tubular inline fan assembly that no longer provided reliable airflow or efficient operation.
By Tom Donohue March 26, 2026
This project transformed an aging, high-risk heat exchanger into a stabilized, documented, and leak-free system, preventing failure, extending the life of a 1999 asset, and avoiding costly replacement.
By Tom Donohue May 5, 2025
Building is renovating space to become a New Resident’s lounge area with an outdoor terrace area.
By Tom Donohue May 5, 2025
This project involved assessing, refurbishing, and upgrading components of existing air handling units to extend their operational lifespan, improve energy efficiency and maintain indoor air quality without a full replacement.
By Tom Donohue May 5, 2025
The client informed TurboChyll of the necessity for additional cooling in their upscale night club, which features an expansive hot tub. In response, TurboChyll implemented a VRF system to regulate humidity levels.
By Tom Donohue May 4, 2025
Client advised TurboChyll that the Fan Motor Shaft had final broke and it was time to replace the Cooling Tower entirely.
By Tom Donohue May 4, 2025
Improved operating efficiency by operating at the fan's best efficiency point and using speed control.
ECM Wind Walls
May 1, 2025
ECM Wind Wall Retrofits on 108 Data Aire Units