Project #1 A - ECM Wind Walls

Project #1 A - ECM Wind Walls

ECM Wind Wall Retrofits on 108 Data Aire Units


Details of Project:


Quantity of Units: 88 total – DACD-0734/0934

Design of Unit: To cool the Data Rooms

Cost Savings:


Dollar amount saved in Kwh saved in 1 year is $178,834.48

  • 16,380.3 Kwh - (Minus) New Fan 3,679 Kwh
  • Total =12,701.3 Kwh saved per year = $2,032.21 saved per unit
  • $2,032.21 x 88 units = $178,834.48

Data Aire Maintenance Details = $56,320.00

  • $160 hr x 1 hours(Maintenance) x 4 times per year x 88 fans = $56,320.00
  • Savings in 1 year - $235,154.00

All of these Savings Reduced Carbon footprint in this Building with The New LL-97 Regulations as shown below up to 782 metric tons of Co2

After Photos of DACD Wind Wall Installed (0734 Model)

Project #1 Performance
Project #1 Electrical
Details of Project #1
By Tom Donohue May 5, 2025
Building is renovating space to become a New Resident’s lounge area with an outdoor terrace area.
By Tom Donohue May 5, 2025
Disassemble and remove existing 10 Ton Main for Rack Room Chilled Water Air handling unit and properly dispose of.
By Tom Donohue May 5, 2025
This project involved assessing, refurbishing, and upgrading components of existing air handling units to extend their operational lifespan, improve energy efficiency and maintain indoor air quality without a full replacement.
By Tom Donohue May 5, 2025
The client informed TurboChyll of the necessity for additional cooling in their upscale night club, which features an expansive hot tub. In response, TurboChyll implemented a VRF system to regulate humidity levels.
By Tom Donohue May 4, 2025
Client advised TurboChyll that the Fan Motor Shaft had final broke and it was time to replace the Cooling Tower entirely.
By Tom Donohue May 4, 2025
Improved operating efficiency by operating at the fan's best efficiency point and using speed control.
More Posts