Project #7 - Plate & Frame Heat Exchanger Cleaning

Project #7 - Plate & Frame Heat Exchanger Cleaning / Regasketing / Dye Penetrant Testing / Close Up


Scope of Work:


The Challenge: Extend life of 25-year-old plate & frame heat exchanger

A critical healthcare facility was operating a 25-year-old plate and frame heat exchanger that had never been dye-penetrant tested, creating risk from unknown plate integrity, obsolete components, and potential internal leaks. With chiller reliability at stake and minimal allowable downtime, the facility needed to extend the unit’s life without triggering a costly full replacement.

  • Detect hidden plate cracks before failure
  • Extends life of aging, obsolete equipment
  • Restores heat-transfer efficiency
  • Eliminates fouling & flow restrictions
  • Identifies internal cross-leaks
  • Replaces degraded gaskets to stop seepage

TurboChyll executed a coordinated labor plus materials program to fully restore integrity & performance of the heat exchanger:

  • Onsite coordination: isolated and drained exchanger with facility staff
  • Plate removal: opened frame and removed plates
  • Cleaning and testing: cleaned plates and performed dye-penetrant testing
  • Regasketing: installed new OEM gaskets
  • Reassembly: rebuilt plate pack and torqued to OEM specifications
  • System restart: pressurized and leak-tested
  • Documented: system performance of chiller, condenser, and heat exchanger

Delivered Results & Value

This project transformed an aging, high-risk heat exchanger into a stabilized, documented, and leak-free system, preventing failure, extending the life of a 1999 asset, and avoiding costly replacement. Coordinated execution minimized downtime, established a 15% failure benchmark for future planning, and ensured uninterrupted hospital chiller and condenser performance while delivering measurable lifecycle value.

Project Photos

By Tom Donohue March 27, 2026
TurboChyll delivered a turnkey modular chiller replacement, upgrading four legacy Multistack units to four new 30-ton Aermec modular chillers.
By Tom Donohue March 26, 2026
The 20th floor return air system relied on an outdated tubular inline fan assembly that no longer provided reliable airflow or efficient operation.
By Tom Donohue May 5, 2025
Building is renovating space to become a New Resident’s lounge area with an outdoor terrace area.
By Tom Donohue May 5, 2025
Disassemble and remove existing 10 Ton Main for Rack Room Chilled Water Air handling unit and properly dispose of.
By Tom Donohue May 5, 2025
This project involved assessing, refurbishing, and upgrading components of existing air handling units to extend their operational lifespan, improve energy efficiency and maintain indoor air quality without a full replacement.
By Tom Donohue May 5, 2025
The client informed TurboChyll of the necessity for additional cooling in their upscale night club, which features an expansive hot tub. In response, TurboChyll implemented a VRF system to regulate humidity levels.
By Tom Donohue May 4, 2025
Client advised TurboChyll that the Fan Motor Shaft had final broke and it was time to replace the Cooling Tower entirely.
By Tom Donohue May 4, 2025
Improved operating efficiency by operating at the fan's best efficiency point and using speed control.
ECM Wind Walls
May 1, 2025
ECM Wind Wall Retrofits on 108 Data Aire Units